Matrix Spaces Thailand
The Apple Cabin modular house: your own home without construction or lengthy approvals
A guest house, a holiday home in the tropics, temporary accommodation during construction, a creative studio/office: installation in 1 day, 15‑year warranty, service life of over 20 years
image alt

USTP

Quick start: installation in 1 day, occupancy immediately after installation.

Comfort “like at home”: a full‑fledged living area, a bathroom, a storage area, panoramic windows.

Adaptation to the tropics: a sealed contour, moisture‑resistant materials, ventilation.

Flexibility of layout: modules can be arranged in a line, in a cascade, around a pool, or on a slope.

Minimum bureaucracy: does not apply to capital construction if transportation conditions are met.

Specifications

Dimensions: 20′ (6.06×2.44×2.89 m) or 40′ (12.19×2.44×2.89 m); a configuration of 2 modules is possible.

Frame: hot‑dip galvanized steel, anti‑corrosion protection.

Windows/facade: panoramic glazing with aluminium profiles, double‑glazed unit.

Internal layout: living area, bathroom, storage area; integration with a terrace is possible.

Finish: moisture‑resistant WPC panels, floor — SPC tile.

Utilities: embedded wiring for electricity, water supply, and sewage; ventilation.

Service life: over 20 years; 15‑year warranty on the structure and sealing.

Usage scenarios:

Guest house on the plot: an isolated space for a family or for renting out.

Holiday home in the tropics: a ready‑made module by the beach or in the garden — move in immediately after installation.

Temporary accommodation during construction: comfortable living until the main house is completed.

Creative studio/office: a private space for work with a panoramic view.

House for parents/relatives: separate accommodation on the plot without a major construction project.

Prices and options

Decision - Modular house
Starting price - from $6,000,
Cost factors - equipment (plumbing, furniture), options (terrace, canopy, lighting), logistics.

Individual solutions: calculation based on the technical specifications — estimate preparation time: 1 working day.

Order process


Consultation (30 min): selection of a configuration tailored to the site and tasks.

Cost calculation (1 day): estimate taking into account options and logistics.

Contract and prepayment: fixing the price and deadlines.

Production: manufacturing at the factory (the timeframe depends on the configuration).

Delivery: transportation to the site.

Installation and connection: setup within 1 day, connection of utilities, commissioning of equipment (if available).

Delivery and installation

Geography of supplies: by region/country (to be specified during the calculation).

Delivery terms: the cost is calculated separately, depending on the distance and dimensions.

Site requirements: flat, hard surface; slope no more than 2%.

Connection: electricity — input cable and shield; water/sewer — plug-in points.

Guarantees and service

15-year warranty: for tightness, load-bearing frame and absence of through defects.

Service support: operation consultations, maintenance recommendations.

Post‑warranty service: repair and replacement of components upon request.

How long does the installation actually take? Installation on a prepared site — 1 day; connection of utilities — 1–2 days.

Is it suitable for a humid climate? Yes: moisture‑resistant materials, sealed joints, and ventilation are used.

Do you need permits? In most cases, no, since the module is not a permanent structure; check the municipality’s requirements.

Can the location be changed? Yes, the design allows the module to be transported between sites.

What is included in the basic package? Frame, glazing, finishing, embedded components for utilities; equipment, plumbing, and furniture — according to a separate technical specification.

Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст
Текст