
UST
Quick start: installation in 1 day, move in immediately after installation.
Flexibility of layout: modules can be arranged in a line, cascaded, around a pool, or on a slope.
“Hotel-like” comfort: a full bedroom, a bathroom, a storage area, panoramic windows.
Adaptation to the tropics: a sealed structure, moisture‑resistant materials, ventilation.
Minimum bureaucracy: does not fall under capital construction if transportation conditions are met.
Specifications
Dimensions: 20′ (6.06×2.44×2.89 m) or 40′ (12.19×2.44×2.89 m); a configuration of 2 modules is possible.
Frame: hot‑dip galvanized steel, anti‑corrosion protection.
Windows/facade: panoramic glazing with aluminium profiles, double‑glazed unit.
Internal layout: bedroom, bathroom, storage area; integration with a terrace is possible.
Finish: moisture‑resistant WPC panels, floor — SPC tile.
Utilities: embedded wiring for electricity, water supply, sewage; ventilation.
Service life: over 20 years; 15‑year warranty on the structure and seal integrity.
Use cases:
Glamping cluster: 5–10 modules near the beach or in the jungle — a quick start with a payback period of 12 months or less.
Expansion of an existing hotel: adding rooms without stopping the operation of the main infrastructure.
VIP pools: isolated modules with a terrace and a water view.
Seasonal building: temporary accommodation for guests during the high season, with the possibility of dismantling.
Turnkey boutique hotel: ready‑made modules with finishing and layout tailored to the concept.
Prices and options
Decision Modular rooms.
Starting price from $12,000.
Cost factors: module size, equipment (plumbing, furniture), options (terrace, canopy, insulation).
Individual solutions: calculation based on the technical specifications — the estimate preparation time is 1 working day.
Order process
Consultation (30 min): selection of a configuration tailored to the hotel concept and site.
Cost calculation (1 day): an estimate taking into account options and logistics.
Contract and prepayment: fixing the price and deadlines.
Production: manufacturing at the factory (the time depends on the configuration).
Delivery: transportation to the site.
Installation and connection: installation within 1 day, connection of utilities, commissioning of equipment (if available).
Delivery and installation
Geography of supplies: by region/country (to be specified during the calculation).
Delivery terms: the cost is calculated separately, depending on the distance and dimensions.
Site requirements: flat, hard surface; slope no more than 2%.
Connection: electricity — input cable and shield; water/sewer — plug-in points.
Guarantees and service
15-year warranty: for tightness, load-bearing frame and absence of through defects.
Service support: operation consultations, maintenance recommendations.
Post‑warranty service: repair and replacement of components upon request.
I’m for the website. Based on this picture. Make it for me. A lot of information. Complete, what is needed for the website.
How long does the installation actually take? Installation on a prepared site — 1 day; connection of utilities — 1–2 days.
Is it suitable for humid climates? Yes: moisture‑resistant materials, sealed joints, and ventilation are used.
Do you need permits? In most cases, no, since the module is not a permanent structure; check the municipality’s requirements.
Can the location be changed? Yes, the design allows the module to be transported between sites.
What is included in the basic package? Frame, glazing, finishing, embedded components for utilities; equipment, plumbing, and furniture — according to a separate technical specification.
Текст | Текст | Текст | Текст | Текст |
Текст | Текст | Текст | Текст | Текст |
Текст | Текст | Текст | Текст | Текст |
Текст | Текст | Текст | Текст | Текст |
Текст | Текст | Текст | Текст | Текст |